Hello. I am new to this site and looking for some much needed guidance. I am currently in week 2 of my new pool startup and having difficulty balancing the water. The interior of my pool is a PebbleFina finish which I have been brushing regularly as it cures to remove the plaster dust, but I cannot seem to get my water levels where they need to be. My PH in particular has been above 8 since the day after the pool was filled. I've been using a Taylor K-2006 test kit and my initial acid demand test on day 2 required 10 drops of R-0005. Following daily additions of dry acid, it has since been reduced to 1 drop of R-0005 as of this morning, BUT, now my TA level is significantly lower. My total levels are as follows:
TA: 60
PH: >8
CH: 150
CYA: <30 (water sample never clouded and black dot in test tube was clearly visible)
FC, TC, CC: 0 (haven't added chlorine yet since other levels are out of range)
I am not sure what to do next. I was advised by a local pool store to lower the PH to within range before tackling the other levels. But since this is new pool plaster I am not sure if that is the correct approach, as it would seem the TA should now come up. Any guidance would be greatly appreciated. Thank you in advance.
TA: 60
PH: >8
CH: 150
CYA: <30 (water sample never clouded and black dot in test tube was clearly visible)
FC, TC, CC: 0 (haven't added chlorine yet since other levels are out of range)
I am not sure what to do next. I was advised by a local pool store to lower the PH to within range before tackling the other levels. But since this is new pool plaster I am not sure if that is the correct approach, as it would seem the TA should now come up. Any guidance would be greatly appreciated. Thank you in advance.