So it begins!
I've been working on this for some time, I'll be posting as much info and questions in regards to my efforts to build the pool owner/builder with myself as the general contractor. It's in San Diego County, and I'll relate sub-contractor experiences as well.
Got the permit today!
Excavation is around April 24th.
I've got the current layout as attached.
Basic Description:
32x15' pool, includes level spa 7' square, spa just an inch or 2 above pool with spill over wall.
Auto pool safety cover
All Jandy equipment except for Pentair pumps.
Considering main pump for filter/heat/SWG, 2nd pump for dedicated jet pump for spa.
Expenses already paid:
2 months of Pool Studio
Engineering drawings/sheets
Permit fees with city
Next items in work schedule:
Moving the A/C
landscaping (saving some plants, removing the rest)
demo of existing patio and walkway
Excavation
Steel
I've been working on this for some time, I'll be posting as much info and questions in regards to my efforts to build the pool owner/builder with myself as the general contractor. It's in San Diego County, and I'll relate sub-contractor experiences as well.
Got the permit today!
Excavation is around April 24th.
I've got the current layout as attached.
Basic Description:
32x15' pool, includes level spa 7' square, spa just an inch or 2 above pool with spill over wall.
Auto pool safety cover
All Jandy equipment except for Pentair pumps.
Considering main pump for filter/heat/SWG, 2nd pump for dedicated jet pump for spa.
Expenses already paid:
2 months of Pool Studio
Engineering drawings/sheets
Permit fees with city
Next items in work schedule:
Moving the A/C
landscaping (saving some plants, removing the rest)
demo of existing patio and walkway
Excavation
Steel
