Hey all,
After 4 years of wavering back and forth, I'm finally going through with an owner build. I'm completely nervous, but I just have to take the plunge - literally! Searching through multiple threads here along with the wiki as well as other sites (before landing here) I'm feeling better.
I'll throw in some initial pics of the area and rough build plans.
My current task is getting quotes from all the trades lined up. So far two excavation quotes were $6,000 and $8,000 which were well over my initial estimates. I'm now following the wiki guide and starting with the rebar folks who can do the excavation. More phone calls to make...
We'll probably changes the steps up a little bit.




After 4 years of wavering back and forth, I'm finally going through with an owner build. I'm completely nervous, but I just have to take the plunge - literally! Searching through multiple threads here along with the wiki as well as other sites (before landing here) I'm feeling better.
I'll throw in some initial pics of the area and rough build plans.
My current task is getting quotes from all the trades lined up. So far two excavation quotes were $6,000 and $8,000 which were well over my initial estimates. I'm now following the wiki guide and starting with the rebar folks who can do the excavation. More phone calls to make...
We'll probably changes the steps up a little bit.



