Hello- we are building a 14x28 vinyl liner pool - we subcontracted the dig, and subcontracting backfill and concrete and electric. It is steel walls, polymer steps .
My guy doing the backfill says I need 6 tandem truck loads of sand - that’s like 4000? I didn’t include that in my budget lol! Is that correct or am I missing something ?
My guy doing the backfill says I need 6 tandem truck loads of sand - that’s like 4000? I didn’t include that in my budget lol! Is that correct or am I missing something ?