Figured id share some pictures from the liner replacement from yesterday.
Beginning
Old Liner out

New Liner In, shop vac off

Shop vac on, water filling

Water level this morning

Current Water level

Installer gave instructions not to add chemicals for 3 days. With our current heat, that has me a bit worried about algae growth. He also said to take water sample to pool store, which i told him i do it all myself with my test kit.
It is a 24' x 52" SwimLine UniBead liner.
I have liquid CYA, liquid chlorine, dry acid, cal hypo on hand as needed based off initial water test
Beginning

Old Liner out

New Liner In, shop vac off

Shop vac on, water filling

Water level this morning

Current Water level

Installer gave instructions not to add chemicals for 3 days. With our current heat, that has me a bit worried about algae growth. He also said to take water sample to pool store, which i told him i do it all myself with my test kit.
It is a 24' x 52" SwimLine UniBead liner.
I have liquid CYA, liquid chlorine, dry acid, cal hypo on hand as needed based off initial water test