So we have selected a pool builder and this is the proposal before we sign the contract and finalize the actual design. How does this look?
Swimming Pool Project
1.
Provide material and labor for the construction of one Swimming Pool with Tanning ledge:
➢
Water surface area for pool is 512 square feet or 16’ wide by 32’ long.
➢
Gravel Base under shell included with hydro-static reliefs valves for protection.
Included:
A.
DESIGN - Shop drawings, standard pool building permits and guidance with HOA.
*Complete pool layout with opportunity to make adjustments and changes.
B.
SUPERVISION- Personalized project manager supervision provided by Legacy Pool and Spa at each and every stage of the construction with direct access. Includes installation of safety fence and silt fence to help control liabilities.
C.
CONCRETE SHELL- Concrete/shotcrete structures with appropriate steel reinforcing. Concrete deposited on vertical surfaces shall be shot at right angle to surface starting at the bottom and continuing upward. Build up in layers of thickness that will not slump, allowing sufficient time between layers for initial set to take place.
D.
PIPING SCHEDULE- 2” PVC Schedule 40 piping for all pools and filter equipment with all-necessary gauges, flow meters and valves for re-circulation system. Piping will be a minimum of 18’’ below finished grade for protection. Unions shall be provided where required for disconnection of exposed piping. Provisions will be made for expansion and contraction by way of swing joints or shaking. Piping will be protected from exposure to aromatic hydrocarbons, halogenated hydrocarbons, and most of esters and key tones that attack the material.
E.
VALVES- All filter system valves (Jandy Neverlube three-way) and plumbing will be 2” and made of PVC construction for corrosion resistance. (Exceeds the typical industry standard but is standard for Legacy
construction.)
F.
POOL LIGHTS- Pool to have (1) Jandy White LED underwater light.
G.
POOL EQUIPMENT-All labor, pipe, and fittings needed to install filtration and sanitation equipment. Equipment included as listed below:
1.
Filtration, control and sanitizing systems for the main pool providing a 4.0 hour turnover rate for approximately 17,000 gallons:
Jandy E-Pump 1.8hp Variable Speed Pump-
Jandy CV Filter Series 340 filtration
G.
INTERIOR FINISH- All interior finishes will be Duracrete smooth white marble (marcite) plaster. Plaster will consist of two (2) parts marble dust to one (1) part white cement. Plaster will have a smooth
consistent finish. Two coats will be applied using the double back method. The plaster will have a thickness of not less than 3/8 or more than 1/2 inch.
H.
INCLUDED ITEMS- Standard items included with your pool:
➢
All plumbing is schedule 40.
➢
All pools receive a minimum of 1 Commercial Grade Skimmer.
➢
2 hi-flow returns are included.
➢
Main drain is STANDARD.
➢
Never-lube valves.
➢
4-HOUR TURNOVER RATE. Saves the life of the equipment by triple the others.
➢
Hand skimmer, Pole, and Brush.
➢
GFCI Protected Outlet.
➢
Pools exceed NSPI building and safety codes.
➢
48 hour scheduled work guarantee.
➢
Complete electrical bonding of pool, deck, and accessories.
➢
Structural, plumbing, and pump warranty.
➢
Steps when entering and exiting the pool.
➢
All necessary inspections and supervision coordinated through Legacy Pools.
I.
STRUCTURAL- 10” bond beam construction with keyway notch system. ½ Steel rebar installation and spacing are the highest rated with 6” x 6” structural spacing reinforcement in coves and stress points to create a strong shell that will last.
J.
MAINTENANCE EQUIPMENT- Pool to be equipped with Leaf skimmer, pool brush and one 16’-0”telescoping poles.
K.
COPING- Legacy Pools includes a variety of 48 standard coping selections consisting of natural full color blue stone coping, irregular tumbled blue stone coping, travertine, techo bloc paver coping, piedimonte coping, traditional brick coping and more.
L.
TILE- Waterline tiles to be 6’’wide band selection from NATIONAL POOL TILE.
(NOTE: Some selections may be an up charge.)
M.
INTERIOR FINISHING- INCLUDES WHITE PLASTER (SEE ALTERNATIVES FOR OPTIONSBELOW)
N.
SUPPORT AND SERVICE- POOL COMPLETE MAINTENANCE SYSTEM REVIEW.
O.
HAULING OF EXCAVATED DIRT IS INCLUDED ALONG WITH STANDARD DUMP FEES.
Swimming Pool Project:
($121,000.00 (One Hundred Twenty- One Thousand Dollars).
Add-ons for pool scope (must add these to the $121,000.00):
Electrical Work
Provide material and labor to install up to 100 lineal feet of electrical work, includes permits, GFI protected breakers for each motor, and conduit to lights: Add – Included
(Additional conduit over 100 will be billed at $41.00 a foot)
Patio/Decking
Provide material and labor to install 400 square feet of brushed concrete patio: Add- Included
(Additional brushed concrete patio space over 400 square feet to be billed at $16.50 per square foot)
Fencing
Provide material and labor to install 100 ft of 48inch tall black aluminum fencing with one double gate and one single gate, line fencing included: Add- Included
Heater
Provide material and labor to install a Jandy 400btu gas heater: Add- Included
*Gas line not included.
Salt System
Provide material and labor to install Jandy Tru Clear 11k salt system: Add- Included
*Salt included
Tanning Ledge
Provide material and labor for 64 sq ft of tanning ledge: Add- Included
Covers
Provide material and labor to install winter cover: Add- Included
Provide material and labor to install automatic pool cover, Aluminum lid (Key): Add- $21,721.83
Please note that items have embedded material budgets unless otherwise listed as a specialty product in the respective line item:
TILE- $5.00 per square foot
STONE- $6.00 per square foot
COPING- $5.00 per linear foot
Swimming Pool Project
1.
Provide material and labor for the construction of one Swimming Pool with Tanning ledge:
➢
Water surface area for pool is 512 square feet or 16’ wide by 32’ long.
➢
Gravel Base under shell included with hydro-static reliefs valves for protection.
Included:
A.
DESIGN - Shop drawings, standard pool building permits and guidance with HOA.
*Complete pool layout with opportunity to make adjustments and changes.
B.
SUPERVISION- Personalized project manager supervision provided by Legacy Pool and Spa at each and every stage of the construction with direct access. Includes installation of safety fence and silt fence to help control liabilities.
C.
CONCRETE SHELL- Concrete/shotcrete structures with appropriate steel reinforcing. Concrete deposited on vertical surfaces shall be shot at right angle to surface starting at the bottom and continuing upward. Build up in layers of thickness that will not slump, allowing sufficient time between layers for initial set to take place.
D.
PIPING SCHEDULE- 2” PVC Schedule 40 piping for all pools and filter equipment with all-necessary gauges, flow meters and valves for re-circulation system. Piping will be a minimum of 18’’ below finished grade for protection. Unions shall be provided where required for disconnection of exposed piping. Provisions will be made for expansion and contraction by way of swing joints or shaking. Piping will be protected from exposure to aromatic hydrocarbons, halogenated hydrocarbons, and most of esters and key tones that attack the material.
E.
VALVES- All filter system valves (Jandy Neverlube three-way) and plumbing will be 2” and made of PVC construction for corrosion resistance. (Exceeds the typical industry standard but is standard for Legacy
construction.)
F.
POOL LIGHTS- Pool to have (1) Jandy White LED underwater light.
G.
POOL EQUIPMENT-All labor, pipe, and fittings needed to install filtration and sanitation equipment. Equipment included as listed below:
1.
Filtration, control and sanitizing systems for the main pool providing a 4.0 hour turnover rate for approximately 17,000 gallons:
Jandy E-Pump 1.8hp Variable Speed Pump-
Jandy CV Filter Series 340 filtration
G.
INTERIOR FINISH- All interior finishes will be Duracrete smooth white marble (marcite) plaster. Plaster will consist of two (2) parts marble dust to one (1) part white cement. Plaster will have a smooth
consistent finish. Two coats will be applied using the double back method. The plaster will have a thickness of not less than 3/8 or more than 1/2 inch.
H.
INCLUDED ITEMS- Standard items included with your pool:
➢
All plumbing is schedule 40.
➢
All pools receive a minimum of 1 Commercial Grade Skimmer.
➢
2 hi-flow returns are included.
➢
Main drain is STANDARD.
➢
Never-lube valves.
➢
4-HOUR TURNOVER RATE. Saves the life of the equipment by triple the others.
➢
Hand skimmer, Pole, and Brush.
➢
GFCI Protected Outlet.
➢
Pools exceed NSPI building and safety codes.
➢
48 hour scheduled work guarantee.
➢
Complete electrical bonding of pool, deck, and accessories.
➢
Structural, plumbing, and pump warranty.
➢
Steps when entering and exiting the pool.
➢
All necessary inspections and supervision coordinated through Legacy Pools.
I.
STRUCTURAL- 10” bond beam construction with keyway notch system. ½ Steel rebar installation and spacing are the highest rated with 6” x 6” structural spacing reinforcement in coves and stress points to create a strong shell that will last.
J.
MAINTENANCE EQUIPMENT- Pool to be equipped with Leaf skimmer, pool brush and one 16’-0”telescoping poles.
K.
COPING- Legacy Pools includes a variety of 48 standard coping selections consisting of natural full color blue stone coping, irregular tumbled blue stone coping, travertine, techo bloc paver coping, piedimonte coping, traditional brick coping and more.
L.
TILE- Waterline tiles to be 6’’wide band selection from NATIONAL POOL TILE.
(NOTE: Some selections may be an up charge.)
M.
INTERIOR FINISHING- INCLUDES WHITE PLASTER (SEE ALTERNATIVES FOR OPTIONSBELOW)
N.
SUPPORT AND SERVICE- POOL COMPLETE MAINTENANCE SYSTEM REVIEW.
O.
HAULING OF EXCAVATED DIRT IS INCLUDED ALONG WITH STANDARD DUMP FEES.
Swimming Pool Project:
($121,000.00 (One Hundred Twenty- One Thousand Dollars).
Add-ons for pool scope (must add these to the $121,000.00):
Electrical Work
Provide material and labor to install up to 100 lineal feet of electrical work, includes permits, GFI protected breakers for each motor, and conduit to lights: Add – Included
(Additional conduit over 100 will be billed at $41.00 a foot)
Patio/Decking
Provide material and labor to install 400 square feet of brushed concrete patio: Add- Included
(Additional brushed concrete patio space over 400 square feet to be billed at $16.50 per square foot)
Fencing
Provide material and labor to install 100 ft of 48inch tall black aluminum fencing with one double gate and one single gate, line fencing included: Add- Included
Heater
Provide material and labor to install a Jandy 400btu gas heater: Add- Included
*Gas line not included.
Salt System
Provide material and labor to install Jandy Tru Clear 11k salt system: Add- Included
*Salt included
Tanning Ledge
Provide material and labor for 64 sq ft of tanning ledge: Add- Included
Covers
Provide material and labor to install winter cover: Add- Included
Provide material and labor to install automatic pool cover, Aluminum lid (Key): Add- $21,721.83
Please note that items have embedded material budgets unless otherwise listed as a specialty product in the respective line item:
TILE- $5.00 per square foot
STONE- $6.00 per square foot
COPING- $5.00 per linear foot