I hired a contractor to install a 21' hard side pool. They left for the day and I inspected what they had done and noticed the pavers under the legs were not all level with the ground. I'm not an installer but my brain is telling me that it's not the right way to do it. Just asking for a sanity check. Is that the right way, get them level even if they sit on top of the dirt and dump sand on top of it all or should they sit level with the dirt before adding sand?





Last edited by a moderator: