Edit: Currently planning to take this over as an owner contracted build, see post 19. The two threads were combined.
I haven't been able to contract my pool builder for over a week. Website is down, office number disconnected, no answer to emails, no answer to phone calls to general manage/owner nor the project manager.
I know there's a long process ahead for me to get this fixed. My question for the forum for now: Total estimate was ~124k. I've paid ~85k. 20x40 gunite pool with tanning ledge pump out, slide, diving board. Gunite and underground piping done and inspection passed. Trenches still open. Need electrical run, equipment, plaster, tile, deck etc. Comparing my % paid to the % of work completed: How much can I estimate I'm going to lose from all this? I'm hoping the number isn't as big as I'm thinking it'll be to help with the stress of it all.
Thanks
I haven't been able to contract my pool builder for over a week. Website is down, office number disconnected, no answer to emails, no answer to phone calls to general manage/owner nor the project manager.
I know there's a long process ahead for me to get this fixed. My question for the forum for now: Total estimate was ~124k. I've paid ~85k. 20x40 gunite pool with tanning ledge pump out, slide, diving board. Gunite and underground piping done and inspection passed. Trenches still open. Need electrical run, equipment, plaster, tile, deck etc. Comparing my % paid to the % of work completed: How much can I estimate I'm going to lose from all this? I'm hoping the number isn't as big as I'm thinking it'll be to help with the stress of it all.
Thanks
Last edited: