Hi all, today is two weeks since our pool has been plastered. I’d like to start using the heat pump but I want to make sure it’s ok to do so. Wet edge says don’t heat the pool for 14 days. Can I turn it on now or wait for a couple more days?
Why no heater use for first 30 days?With new plaster there is a lot of plaster dust in the water and the pH is usually very high. When you heat water the potential for scale formation in the heater increases significantly. The actual timeframe for waiting to use the heater has no real merit. As long as the plaster dust is under control and the pH is in range there is no reason not to use it. Your risk of rushing to use the heater is scale clogging up the heater coil.
Just want to clarify. Despite the wet edge guide saying you can heat after 14 days, you suggest waiting for 30 days? Or are you saying timeframe doesn’t matter as long as the water is well controlled?
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.
Welcome to TFP! For a wealth of pool care information please check out our free Pool School. If you are in need of specific help then we encourage you to Register and ask us here in the forum!