Working on leveling bottom track. Have a few pavers in. all level and set at the same height but there are gaps under the track, causing the actual track to be out of level. Do I just pack dirt underneath the track to bring it up to level or will this cause issues later on? Also considered setting another paver under the track, between the 2 pavers that are under the plates to bring track to level, then packing any remaining gaps with dirt. Not sure if this option is possible or overkill. I would rather just pack with dirt but don’t want it settling later on.