Intex 24x12x52 install

LuckyM

New member
Mar 16, 2024
3
edgerton, ks
Getting ready to put up our first pool. I have already leveled the area it will go. I have 4” thick cement pads for the legs. If I put xps board or anti fatigue mats down should the cement pads be level with this material or just level with the ground?
From my reading it seems people have done it both ways.l
 
So the legs are going to be raised 4" above the ground where the liner floor will sit?

The liner can probably stretch the 4" but I would not want to put that stress on it.

I would dig down 4" where the pads will sit to get the pads level with the ground and the pool floor.

 
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.