How long to wait to add polyquat after adding chlorine

ba67

Well-known member
Oct 17, 2018
127
Southern Kentucky
Pool Size
18000
Surface
Fiberglass
Chlorine
Liquid Chlorine
I'm closing tomorrow. I just tested my water and FC was below 1/2 SLAM level so I added a quart of chlorine to get it back up to 1/2 SLAM (8 ppm). How long do I have to wait after adding the liquid chlorine to add the polyquat? Since its rather thick, is it best to dissolve it in a bucket of water and pour it all around the pool or is it better to just pour it around the perimeter and brush after adding it.
 
Wait 30 minutes after adding chlorine for Polyquat 60.

Just pour the Polyquat around the pool and let the pump mix it fir 24 hours or as long as you can.
 
  • Like
Reactions: ba67
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.