Jumping in to introduce myself and share a few thoughts about our current pool build. My wife and I are working through a pool build with a PB here in Fort Lauderdale! We're about 90% of the way done and just started filling the pool a few days ago. We are about 8 months into the build and almost ready for summer!
Pool specs:
18' x 9' rectangle
3'6" to 5'6" depth
~4,000 gallons
Full width stairs on shallow end, full width bench on deep end
Plaster: Diamondbrite "Classic"
Deck: Natural Limestone from Sinai Marble and Stone
Waterline Tile: MODA Magnolia Blue Porcelain Tile
Pump: Hayward MaxFlo XE 1.65
SWG: Jandy TruClear 11k
Filter: Hayward SwimClear C150S
Unfortunately, this is the best 'before' photo that I have. The backyard was mainly grass with 6 invasive ornamental trees:

We signed the agreement with the PB on May 6, 2024 and "broke ground" in late may:
May 2024 - Tree removal
June 2024 - Excavation and Initial Forms


July and August 2024 - Finalizing Forms

October, November, December 2024 - Gunite, Plumbing, and Backfill



Pool specs:
18' x 9' rectangle
3'6" to 5'6" depth
~4,000 gallons
Full width stairs on shallow end, full width bench on deep end
Plaster: Diamondbrite "Classic"
Deck: Natural Limestone from Sinai Marble and Stone
Waterline Tile: MODA Magnolia Blue Porcelain Tile
Pump: Hayward MaxFlo XE 1.65
SWG: Jandy TruClear 11k
Filter: Hayward SwimClear C150S
Unfortunately, this is the best 'before' photo that I have. The backyard was mainly grass with 6 invasive ornamental trees:

We signed the agreement with the PB on May 6, 2024 and "broke ground" in late may:
May 2024 - Tree removal
June 2024 - Excavation and Initial Forms

July and August 2024 - Finalizing Forms

October, November, December 2024 - Gunite, Plumbing, and Backfill