This is my second year setting up my intex pool...last year i was off an inch or maybe two as far as leveling went....i want to perfect it this year, i intend on leaving it up permanently (until the pool itself fails) since i live in warm and sunny North Carolina. The problem is this....i have found i am completely incapable of leveling earth. lol Take a look at the attached photos to see what i've got so far.
I have the pavers dug subsurface and then intend on laying the foam boards on top. Last year i had the pavers atop the earth and it was stretching the liner a bit.
How to get i get perfect level betwee the 16 pavers?
picture 1
picture 2
- - - Updated - - -
I have the pavers dug subsurface and then intend on laying the foam boards on top. Last year i had the pavers atop the earth and it was stretching the liner a bit.
How to get i get perfect level betwee the 16 pavers?
picture 1
picture 2
- - - Updated - - -