Finally got the pool up and mostly filled. Hope to start the filter tonight. It has taken a month to get it put up, lots of rain in central PA this summer.
We started with a bit of ground leveling. (Traded old 18' pool for this! Was like new.)

Then a base of modified 2A.

Next was leveling the pavers. (Took forever! Part I disliked the most! Only did a few at a time due to weather.)

Next was sand....

Don't have a picture of the elephant pad (gorilla pad knockoff) because we got everything done so quickly. Probably overkill, but being on the edge of a field, we didn't want to take any chances with bugs or thick grass coming through the liner.
Pool up, not straightened yet.

Half full, legs leveled. (Picture crooked, not pool, lol.) finally some sunshine!

Got the sand filter hooked up, tested TA, 80, PH around 6.8. Got the CYA hanging already, in anticipation of starting filter in the next hour. Of course, it started to drizzle as I was doing my testing, so I quit. Weekend looks good for swimming, should be ready!
We started with a bit of ground leveling. (Traded old 18' pool for this! Was like new.)

Then a base of modified 2A.

Next was leveling the pavers. (Took forever! Part I disliked the most! Only did a few at a time due to weather.)

Next was sand....

Don't have a picture of the elephant pad (gorilla pad knockoff) because we got everything done so quickly. Probably overkill, but being on the edge of a field, we didn't want to take any chances with bugs or thick grass coming through the liner.
Pool up, not straightened yet.

Half full, legs leveled. (Picture crooked, not pool, lol.) finally some sunshine!

Got the sand filter hooked up, tested TA, 80, PH around 6.8. Got the CYA hanging already, in anticipation of starting filter in the next hour. Of course, it started to drizzle as I was doing my testing, so I quit. Weekend looks good for swimming, should be ready!