    Pour in Place Coping Question

    Hi everyone, I am under construction in socal. 30 x 15' pool with a 3' raised bond beam on one side to retail a slope. We just had our coping poured on a fairly hot day last Friday. Today I noticed that are about 8 hairline cracks forming between the joints, 7 of them are on top of the RBB and...